We’re proud of our work. Here in our case studies section, you can see a selection of some of the latest projects TSS have supported on.

Insurance claim works delivered by TSS Survey for house extensively damaged by flooding

Value: £16,000

Dates: January 2019 to February 2019

Insurance Repair Claim after an Escape of Water Incident

Read more

TSS Survey manages the insurance repair claim for fire-damaged ninth-floor flat

Value: £20,000

Dates: February 2019 to March 2019

Insurance Repair Claim after Fire at Ninth-Floor Flat

Read more

TSS Survey manages £48,000 repairs works following fire caused by faulty iron

Value: £48,000

Dates: November 2018 to June 2019

Insurance Claim as a Result of Fire Damage by Faulty Iron

Read more

DCWW Water Network Repair and Maintenance

Value: £75 million

Dates: Oct 2015 - Nov 2018

Water Network Repair and Maintenance

Read more

Thames Water AMP6 Infrastructure Alliance

Value: £20 million p/a

Dates: June 2016 - Present

Thames Water AMP6 Infrastructure Alliance

Read more

Western Power Distribution Network Areas

Value: Up to £40 millon p.a.

Dates: Dec 2016 - Nov 2018

Network Areas Construction & Refurbishment/rebuilding of 11kv,33kv,66kv light & heavy construction overhead lines

Read more

Contact tss

For more information or to enquire about our services, please don’t hesitate to get in touch.

Contact us